Quantcast
Channel: SCN : Unanswered Discussions - SAP HANA Developer Center
Viewing all articles
Browse latest Browse all 5115

Cannot attach HANA System to BW Project in HANA Studio

$
0
0

Hi Experts,

 

 

I am creating a Composite provider in BW Modeling tools, which requires a HANA view to be included. can you please help with this

 

 

Issue: While creating a HANA Project, I am not able to attach a HANA System to it. There is no error message displayed, but I could see a entry in error log saying 'Unhandled event loop exception"

 

 

Version Used:

BW - 7.4 SP 11

HANA Studio - 2.0.19

HANA DB - 1.00.097.00

BW Modeling Tools - 1.11.7

ABAP Development Tools - 1.44.1

 

 

Steps Followed:

1. Install ABAP Development Tools, followed by BW Modeling Tools

2. Obtained the required authorizations per the Note which describes the authentication required.

3. Added a host entry of the HANA DB instance

4. Logged in to HANA System from HANA Admin perspective.

5. Tried creating a BW Project from BW Modeling perspective.

 

 

Attaching the details collected in error log as well. Let me know if additional details are required

 

 

Thanks,

Saranya


Viewing all articles
Browse latest Browse all 5115

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>