Hi Experts,
I am creating a Composite provider in BW Modeling tools, which requires a HANA view to be included. can you please help with this
Issue: While creating a HANA Project, I am not able to attach a HANA System to it. There is no error message displayed, but I could see a entry in error log saying 'Unhandled event loop exception"
Version Used:
BW - 7.4 SP 11
HANA Studio - 2.0.19
HANA DB - 1.00.097.00
BW Modeling Tools - 1.11.7
ABAP Development Tools - 1.44.1
Steps Followed:
1. Install ABAP Development Tools, followed by BW Modeling Tools
2. Obtained the required authorizations per the Note which describes the authentication required.
3. Added a host entry of the HANA DB instance
4. Logged in to HANA System from HANA Admin perspective.
5. Tried creating a BW Project from BW Modeling perspective.
Attaching the details collected in error log as well. Let me know if additional details are required
Thanks,
Saranya