Hello All
I have a requirement to call 3 different stored procedure/views from XSJS. All 3 objects are similar (input params, columns).
I am trying to understand, if i can make a call to HANA DB (paralelly, all 3 calls together). so that, the time to get results will be 1/3 if we call the objects serially.
I have seen, something about the scheduling feature. But, this does not suit my requirement.
Any help/guidance in this regard would be very much appreciated.
btw, I am on SPS 10
Regards
Giri